Direct-to-factory sourcing from China and Southeast Asia — without the language gaps or the 3am WhatsApp threads.
Our on-the-ground team in Shenzhen handles sourcing, factory audits, and QC,
with US and EU account leads in your timezone. Part of a 9-year-old import group with $100M+ sourced.
Trusted by Amazon brands & retailers sourcing $100M+ from Asia
Moinian+ 200 more
Our philosophy
We don't just find factories. We become their strategic partner.
Exclusive partnerships, deep operational integration with select factories, and demand aggregated across continents.
Pricing, priority and reliability a single buyer can't secure alone.
Mircea, Fu & Alex — founders on the ground in Shenzhen.
Since 2020 · Strategic partnership program
Most sourcing agents live one email away from being replaced. So we did something different: we built long-term strategic partnerships with 10+ factories we source from most — the ones we've stress-tested for years across quality, delivery, and communication.
Those partnerships give us a seat at their planning tables, priority when capacity is tight, and terms no independent buyer can secure alone. When a bigger client shows up mid-production, your order doesn't get bumped — because our relationship runs deeper than a single purchase order.
10+Strategic partner factories
3Continents of aggregated demand
9 yrsBuilding these relationships
$100M+
Sourced from Asia at group level
20+
In-house team · USA · Europe · China
2,500+
Verified suppliers across China & SE Asia
9 yrs
Operating across Asia
Why brands switch to us
Sourcing the way it should have always worked.
Most US brands either go through Alibaba and gamble on a stranger, or hire a freelance agent and hope they don't get a kickback from the factory. We replace both — with a real company, a real team, and a flat % fee.
No traders. Only factories.
We buy direct from the people pressing the plastic, sewing the fabric, milling the metal. Every supplier is audited by our own team on the ground.
Factory audit report before any wire transfer
NDA signed with every supplier
Trade insurance + business registry verification
Legally binding China-to-China contracts on every order
One team, three timezones.
Your account lead replies in your business hours — not theirs. US ops, EU bridge team, and China sourcing specialists handing off the work as the sun moves. Nothing waits 18 hours for a reply.
US-based CFO & account leads (Andrei)
Europe ops bridge — covers both sides of the day
Mandarin-fluent sourcing team on the factory floor
We don't search for suppliers. We make them compete.
For every sourcing project, we make 100+ factories compete for your business. Our local sourcing team and AI evaluate each factory across 50+ quality, compliance, capability, and risk indicators. That's how we create our internal score.
Better pricing
Higher quality
Lower risk
Manufacturing partners built for long-term growth
How it works
Six steps from "I have an idea" to "It's in my warehouse".
01
Brief us
You send a product, detailed characteristics, a photo, or a competitor link. We respond in <24h with what's feasible.
02
We source
Our China + Southeast Asia team hits our database of 2,500+ vetted factories and requests quotes that same week.
03
Samples land
The top factories ship samples to our Shenzhen office first. Our team inspects them, and we forward only the ones that meet spec — saving you weeks of back-and-forth before you touch the product.
04
We negotiate
MOQs, customization, packaging, payment terms — all handled by us. You pay a flat % on the order value, agreed up front. No hidden markups.
05
Production + QC
Our team inspects on-site mid-production and pre-shipment. Photo + video report before container loads.
06
Delivered to your door
Sea or air freight, customs cleared, and routed straight to your 3PL or warehouse. One invoice in USD covers it all.
What we do
Everything between your idea and your warehouse.
🔎
Product sourcing
From a photo, link, or vague idea — we find the factories that actually make it.
🏭
Factory audits
Our team visits in person. Capability, capacity, certifications, ownership check.
✅
Quality control
Mid-production and pre-shipment inspection. Defect rate report before you pay the balance.
🚢
Freight & customs
Sea, air, or rail. We handle the bill of lading, customs broker, and duties in USD.
Canton Fair, Yiwu, Vietnam Expo — we walk the floor for you and shortlist suppliers.
Honest comparison
How we stack up against the alternatives.
Asia Sourcing Pros
Alibaba direct
Freelance agent
You speak to a US-based account lead
✓
—
—
On-the-ground factory audit before wire
✓
—
Sometimes
Pre-shipment QC by our engineers
✓
Pay extra
Outsourced
Bilingual team in your timezone (US + EU + CN)
✓
—
—
Flat fee — no factory kickback
✓
N/A
Usually 5-10%
NDA + IP protection on your designs
✓
—
Verbal
Real-time production dashboard
✓
—
WhatsApp
Case studies
Real brands. Real savings.
Amazon US · Fitness
Mava Sports: from a single SKU to a multi-line Amazon catalog.
Mava sells fitness accessories on Amazon US. We've sourced and produced their product line for years — from grip pads to lifting straps to knee sleeves — running QC on every batch before it ships.
2M+customers reached
300+SKUs in catalog
<1%defect rate
Real estate · Procurement
Moinian Group: bulk procurement for US development projects.
NYC-based developer with a billion-dollar real estate portfolio. We handle direct-from-factory sourcing — saving the layered margin of US distributors. Coordinated across multiple project sites.
$1B+portfolio scale
3categories on ongoing supply
Multi-sitedelivery coordination
Bathroom fixtures · Retail
Savini Due: mirrors and ceramic sinks, sourced direct.
Italian-market bathroom fixtures retailer doing $60M+ in annual revenue. We source their mirrors and ceramic sinks direct from Asian factories — replacing what would otherwise require a full-time procurement lead on their team. They keep the savings, we keep the factory relationship.
$60M+annual revenue
10SKUs on ongoing supply
Directfrom ceramic + mirror factories
Estimate your savings
See what you'd save by sourcing direct from the factory — and without hiring a US procurement lead.
Sourcing from China through an in-house employee means an extra $75K–$120K a year in salary, plus benefits and management time. When we handle it, that role disappears. Enter your numbers below — the calculator adds both savings together.
Meet the team
The people who'll actually be on your account.
Sourcing is a people business. You'll work directly with the founders and operators below — no junior account manager filtering your emails.
Alexandru Jurca
Co-founder
Brand operator who exited his last company to an international investment fund. Today he builds the sourcing platform serving clients with $1B+ in combined revenue.
Fu
General Manager · China
20+ years across Chinese manufacturing and trade. Leads the Shenzhen team that visits factories, runs audits, and inspects every order before it leaves the country.
Mircea Joian
Co-founder
Built and exited a European sports brand with 1.5M+ customers. Now runs the import group and is a recurring speaker at Alibaba's international summits.
Andrei Jurca
CFO · US Operations
Runs a US-Europe accounting practice with 50+ active clients. Your point of contact for US contracts, payments in USD, and tax/duties clarity.
Andreea Atanasov
Import Specialist
10+ years in customs, freight, and import compliance. Coordinates the bill of lading, broker handoff, and the paperwork that keeps your container moving.
Malina
Sourcing Specialist · Shenzhen
On the ground with Fu's team in Shenzhen. Handles day-to-day client communication and coordinates supplier follow-ups so nothing falls between the ops team and your inbox.
Bella
QC Coordinator · Shenzhen
Runs the pre-shipment inspection queue. Every container you receive from us was signed off with her checklist, photos, and report.
+15sourcing specialists, QC inspectors and ops staff across China and Europe
The Shenzhen team — your eyes and hands on the factory floor.This is who walks the audit, runs the QC, takes the production photos, and gets the container loaded right.
🇺🇸
United States
Account leads & CFO
Your day-to-day contact in your timezone, plus contract & payment handling in USD.
🇷🇴
Bucharest & Deva
Operations HQ
Customer ops, import compliance, and the bridge between US and China business hours.
🇨🇳
Shenzhen, CN
Sourcing & QC engineers
The people who actually visit factories — fluent in Mandarin and English, on call for every order.
Recognized in the industry
Speaking on the same stages as the platforms your factories are listed on.
Our co-founder is a recurring speaker at Alibaba's international summits — presenting Asia Sourcing Pros case studies in front of thousands of Chinese suppliers and global buyers. It's how we get the priority callbacks when your order needs to move.
Keynote · Alibaba International Summit, HangzhouPresenting case studies from billion-dollar US clients sourcing through us.
At Alibaba HQ, HangzhouDirect working sessions with platform leadership.Talk: Post-production QC done rightTo an audience of 1,000+ Chinese suppliers — the people running your line.Official summit speaker lineupAlibaba Cloud International Summit · listed alongside platform leadership.
“We tested three agencies before landing on Asia Sourcing Pros. They were the only ones who walked the factory floor on a Saturday because our launch slipped. That's the difference.”
FAQ
Questions we get on the first call.
Can't find the answer? Just book the call — we'd rather you ask us directly.
How do you make money — and are you taking a kickback from the factory?
No kickbacks. Ever. We charge a flat sourcing fee (or a fixed % above factory cost, agreed up front in writing).
What's the minimum order size you'll take on?
We typically work with brands ordering $30K+ per PO, but we make exceptions for repeat clients and clear roadmaps.
Do you do private label / custom products or only off-the-shelf?
Both. Roughly 60% of our work is private label, including tooling, packaging design, and compliance documentation.
What categories do you cover?
Consumer electronics, home goods, kitchen, fitness, automotive accessories, packaging, promotional. We say no to food, regulated medical, and weapons.
How long does a typical project take, from brief to delivery?
For off-the-shelf products: 4–8 weeks (samples in 2, production in 3–4, shipping in 2–3). For custom / private label: 8–14 weeks depending on tooling and MOQ. We give you a realistic timeline in the first call — not the optimistic version.
What if the goods arrive defective?
If our QC missed it, that's on us. We renegotiate with the factory on your behalf, secure replacements or credits at no extra cost to you, and rebuild the inspection checklist so it doesn't happen twice. We answer for the mistake — you don't.
Let's talk
Tell us what you want to source. We'll come back with a plan in 24 hours.
✓ Free 20-min call with a US-based account lead
✓ No NDAs to sign before the first call
✓ We'll tell you if we're not the right fit
AS
Asia Sourcing ProsOnline — typical reply in <10 min
Hi 👋 — we're online in China right now. Send us your product and we'll come back within 10 minutes with what's feasible.